Bus Duct Installation

The process of bus duct installation requires precision and technical knowledge in order to ensure safety and proper functioning. A bus duct is a Bus Bar system that eliminates the need for individual cables and is an efficient, economical and space-saving solution for power distribution.

At Balaji Engineers, we have an experienced team of experts and technicians that have the technical expertise to install and rectify existing bus ducts. With a manufacturing setup located in Shiroli MIDC Kolhapur, we ensure our customers’ satisfaction with quality products and timely delivery at the site.

The bus duct installation process begins with proper loading and unloading of heavy components at the site. The installation includes handling of all components, un-priming of the metal ducts, degreasing and cleaning of site, wiring the metal ducts correctly, and then installation of the components into the ducts. Inspection of the product is done to ensure its safety and proper functioning.

The installation team from Balaji Engineers is specialized in bus duct installation and tests the ducts post-installation to ensure that they are working properly. Segregation of the neutral and phase conductors is done to prevent shock hazards and any other faults.

After the installation, our experts make sure that the installation is in compliance with local building codes. The teams make sure to follow up with the customers on the status of the installation and provide guidance on the functioning and maintenance of the ducts.

Bus ducts are essential for power distribution and they not only provide safety and convenience, but also reduce operational costs. Therefore, it is important to install them properly. That is why Balaji Engineers aims to provide expert service for bus duct installation and provide engineers with technical support as well.

Erection of Bus Duct with Tools

The job will be carried out by manual means. The following are the types of Tools identified for works

Balaji Engineers SITE : Aditya birla Ltd (Sokatas) Kagal Kolhapur

Fork Lift for transporting Busbar

Chain Block pulley (suitable capacity)

Portable Hand Tool

Measuring Tape

Marker Tape

Spirit Level (1.5m to 2m long)

Drilling Machine

Torque Wrench tools

Level Threads

Hammer

Multimeter

Standard Electrical tool kits

1000V Megger

Simple Electrical Tools (plier, screwdriver set and etc.)

Ladder

Erection of Bus Duct

Erection of Bus Duct

Testing of Bus Bar Duct

We check and confirms that the connections are correct, and also we conduct a continuity test on the two bus duct sections that will be linked and recorded. If accurate readings cannot be obtained, bad busbars should be taken out, replaced with new ones, and the system tested again.

Using a megger, gauge the resistance between the phases and the soil. Measure the resistance of each main branch after installation, We Use a torque wrench to retighten all joint bolts in the busbar portion being tested in the event of low readings. If accurate readings cannot be obtained, bad busbars should be taken out, new sets should be installed, and the test will be repeated on site

Testing of Bus Bar Duct

Testing of Bus Bar Duct

Balaji Engineers Panel Div

Balaji Engineers having experienced Man power in Panel and bus duct work , starting from designing of bus duct panel to charging and commissioning of bus duct panel we gave our best on site . Our team is well equipped with tools and tackles as well as all safety equipment’s and devices . After execution of bus duct panel work we take all related testing of bus bar to confirm its accuracy . Out team having Contact resistance measurement testing kit upto 100 amp , Insulation tester , High voltage testing kit etc.